Emergency boards
Emergency boards must ensure that emergency information is gathered in one place and is easily accessible to the users of the building, e.g. in case of evacuation.
The emergency boards contain information about fire prevention and about responding to an emergency. On this page, you will find standard information for the boards.
It is a local responsibility that the emergency boards are updated and that evacuation procedures have been practiced locally. To do this, use the evacuation video which is available in both Danish and English.
Three types of emergency boards
- The primary emergency board which must be wall-mounted at the main entrance of the building (large red board)
- Supplementary emergency boards that can be wall-mounted at critical locations in the building (small red board)
- The meeting room board which must be wall-mounted in meeting rooms subject to operational regulations (small whiteboard)
Information material
Space distribution plans are available from CAS Service Center or CAS BIM
Magnet pockets and vests can be obtained by contacting Campus Service Health and Security Jesper Fløche or Søren Fugleberg.
Contact
Jesper Fløche Senior Emergency Manager Campus Service Mobile: +45 93510881 jesfl@dtu.dk
Mads Madsen Emergency Manager Campus Service Mobile: +45 93510851 mpvma@dtu.dk
Emergency boards standards
- Rules of conduct
- Fire and evacuation instructions
- Action card, Evacuation Vest (must be laminated)
- Action card, Assembly Point Vest (must be laminated)
- Action card, Local Resource Person Vest (must be laminated)
- Action support plan (being prepared)
- Only for Risø Campus: Procedure for radioactive leak to outer environment
Empty templates
- Action Card, Evacuation Vest (use only in agreement with CAS ABB, must be laminated)
- Special Local Conditions
- Action Card, Resource Person Vest (use only in agreement with CAS ABB, must be laminated)
- Action Card, Assembly Point Vest (use only in agreement with CAS ABB, must be laminated)
- Fire and Evacuation Instructions (use only in agreement with CAS ABB)